Motorists plying the Lagos-Ibadan Expressway were thrown into a six-hour traffic nightmare on Tuesday as ongoing repairs on the Kara Bridge triggered severe congestion along the busy corridor. The gridlock, which was compounded by rainfall on Wednesday, disrupted traffic movement and temporarily affected some aspects of the repair work, with the congestion stretching more than
Read More: https://punchng.com/six-hour-nightmare-as-bridge-repairs-choke-lagos-ibadan-expressway/

Back to Home
Six-hour nightmare as bridge repairs choke Lagos-Ibadan Expressway
Punch Nigeria about 4 hours 1 mins read
This article was sourced from an external publication.
Share this article
