The House of Representatives is working to revive the abandoned 330kV Ikot Ekpene–Ikot Abasi Transmission Line Project, boosting Akwa Ibom power supply.
Read More: https://punchng.com/reps-move-to-revive-abandoned-akwa-ibom-power-project/

Back to Home
Reps move to revive abandoned Akwa Ibom power project
Punch Nigeria about 3 hours 1 mins read
This article was sourced from an external publication.
Share this article
